HARBOUR PIPING - PRODUCT TRANSFER FACILITIES


Jetty Operations

    • The products are pumped from ship to the terminal by ship pumps.
    • Number of pipe lines used in Inner Harbour – 2 lines, two mild steel 8 inch.
    • Number of pipe lines used in Main Harbour – 2 lines, one mild steel 12 inch and one Stainless steel 8 inch.
    • Pipe details like materials, diameter and pressure depend on the nature of the product derived from MSDS; pressure does not exceed 5 bars.
    • Distance covered from Jetty to terminal through pipelines ( Underground – 150 M Inner Harbour and 1500 M from Main Harbour)

TRUCK LOADING & DISCHARGE FACILITIES


Product Loading & Offloading

a) Ship to Shore transfer

b) Shore to Ship transfer

c) Shore to Road tanker transfer

d) Road tanker to Shore transfer